Fellten
FelltenQuick-start guide
Quick start8 steps Main I/O pin-outInteractive

Orion BMS 2 · Quick-Start Guide

The fast path from a boxed Orion BMS 2 to a tested, running system - eight ordered steps, an interactive Main I/O pin-out, and the connector reference you need while wiring. A companion to Ewert's quick-start sheet; always follow the full manuals for safety-critical detail.

Steps
8
Power sources
3
Main I/O pins
26
On-board thermistors
8
CAN interfaces
2
Operating V
9-30 V
02

Before you begin

Read the safety sheet, and keep everything disconnected

Read the provided safety sheet before you set up your BMS. As you wire the various connectors, keep them disconnected from the BMS until you are instructed to connect it. Do not plug the BMS into the batteries until the wiring has been verified (step 4).

03

Setup steps

Work through these in order. Tap a step to open it; mark each complete to track your progress (saved in this browser).

04

Connector pin-outs

The pin-out sheet shows the wire side of each connector. Search or filter the Main I/O pins below; tap any row for detail. Click the diagram to enlarge.

Current-Sensor connector

CANdapter (DB9)

Thermistor / remote-tap pins share the Current-Sensor / Thermistor connector - see the diagram for exact positions.

Orion BMS 2 pin-out diagrams - Main I/O, Current Sensor / Thermistor, CANdapter and Voltage Tap connectors
Orion BMS 2 pin-out diagrams · wire side · © Ewert Energy Systems. Click to enlarge.
05

Documents & downloads

The full manuals and the original quick-start sheet. Links open in a new tab.